Forma Fabrica

Suspended Pool and Gym

Project description

This project is unique on a European scale. We are making an exceptionally attractive PMMA pool and gym in a reinforced-concrete frame on top of Hotel Moderno in Poznan.

The task was technologically difficult. Huge acrylic blocks and their weight are a challenge in production and transport, especially horizontal and vertical transport.

The body of the pool was limited by the dimensions of a sea container, because the acrylic itself was produced by our partner in China.

The project involved a significant number of arrangements with other disciplines, such as reinforced-concrete technology, filtration technology, air conditioning and insulation.

Project consultation

Do you have an unusual PMMA project?