Installation of thick 130 mm panels into reinforced-concrete structures.
Installation inside a building with closed ceilings required a substructure and hoists fixed to the ceiling in order to mount the panels.
Forma Fabrica
Project description
Installation of thick 130 mm panels into reinforced-concrete structures.
Installation inside a building with closed ceilings required a substructure and hoists fixed to the ceiling in order to mount the panels.
Gallery