Because we were working on the deepest pool in the world, it was necessary to show its depth.
For this purpose, the footbridge has a bottom glazing system.
On the wet side, we installed acrylic panels, above which quartz-glass panes were installed with borosilicate coloring removed.
The glass panels were made as laminated glass consisting of three panes, each 15 mm thick.